Project Scope
| Project | Wildcat point generation facility |
| Client | Confidential |
| Consultant | Confidential |
| Contractor | Confidential |
| Project Status | Completed. |
| Scope | Structural Engineering Design & Detailing. |
| Description | Performed Stress Analysis for 36” piping covers Rotating equipment’s. Stress analysis performed for super critical temperature of 1450 F (787.77 C). Support Analysis for entire piping networks. Prepared shop drawing for all types of support in piping network. |