Project Scope
| Project | Doha Metro – Greenline Elevated–Al Riffa Station |
| Client | Confidential |
| Consultant | Confidential |
| Contractor | Confidential |
| GSAS Typology | GSAS v2.1 Railways |
| Target Rating | 4 Stars |
| Scope | Design & Build (CDA) & Construction Management (CM) GSAS facilitation, Preparation of LOD 500 As Built models and drawings by using 3D Laser Scan Point Cloud for MEP and Architecture. |